Leadville fully operational!

August 23, 2021 | Filed under: Uncategorized

The Lead­ville mac­hine is back up and fully op­eration­al with a com­plete­ly new solar power sys­tem (panels, bat­te­ries, and con­troll­ers). The loss of micro­wave comms was due to both micro­wave radios being blown, most li­ke­ly due to a lig­htn­ing strike. That re­stores our micro­wave link all the way to Grand Junc­tion again too.