Thorodin fully operational

September 5, 2021 | Filed under: Uncategorized

The Mt. Thorodin site is now fully op­eration­al with both the main and bac­kup re­peat­ers upgraded. Thanks to Doug (K2AD), Char­ley (K4NYN) and his son Lucas, and Rick (KK0COP). The site is now back up to full power, full re­dun­dan­cy, and re­peat­ers that have much bet­t­er re­mote di­ag­nostics.